...
Apologies
Input Material
- NFV AN presentation on management data analytics function (MDAF) : Xia Haitao Huawei
View file |
---|
name | ETSI NFV AN presentation on the MDAF_final.pdf |
---|
height | 250 |
---|
|
- ETSI NFV AN plans: Deng Lingli CMCC
View file |
---|
name | NFVIFA(23)000204r2_AN M-SDO presentation for IFA050.pptx |
---|
height | 250 |
---|
|
Meeting Agenda
- Permsison Permission to record
- Introduction
- Open Meeting IPR
- ETSI NFV AN Presentation
- Q&A
- AOB/ next steps
...
Panel |
---|
borderColor | red |
---|
titleColor | red |
---|
borderStyle | solid |
---|
title | Call for IPR Declaration |
---|
|
- Informational Meetings (Open Meetings)
“This is an open information meeting in which no information or materials furnished or provided by the attendee shall constitute or contain intellectual property and will not be treated or protected as such. All attendees understand and accept this statement.” |
Meeting recording
AN SDO Information exchange meeting ETSI NFV AN
Date: Mar 27, 2023 01:46 PM London
https://us02web.zoom.us/rec/share/ad6S9vUnhTX-c6xccmxlwXGkrDyiOEVw0W2OrevdtBu7EcQMo3OK7n0RN8o6jfS5.Py4YYC16kgv6aHDi
Chatlog:
Meeting notes
meeting_saved_chat.txt | height | 250 |
---|
|
Meeting notes
- NOT FULLY CURATED
- Permission to record - granted
- Introduction
- Dave introduced the ETSI NFV speakeer
- Xia Haitao and Deng Lingli
- Open Meeting IPR
- Dawe notified the meeting that thisis an open meeting with no specific IPR protections
- ETSI NFV AN Presentation
- NFV AN presentation on Management Data Analytics Function (MDAF) Haitao Xia Huawei
- Presented overview of ETSI NFV MANO and addition of automation functions including Policy Management and Closed Loop Automation
- Showed where the new functionality of MDAF is located iwithin ETSI MANO.
- Notion is to be able to monitor cloud environment And MaNO in a uniform way though asynchronous Data Analytics Interface
- MDAF/ MDA service interface and information model specification in ETSI GS NFV-IFA 047 (v4.4.1), is just published in March 2023.
Covering MDA service requirements and corresponding service interface requirements are defined. Is an addition function to provide uniform view of multiple resources. - Currently, studying uniform alarm management approach with common alarm syntax.
- Slides end with complete list of references and URLs.
- Question: about how the alarm types will be related to commonly available Kubernetes monitoring tools like Prometheus
- Answer: Currently under study but need recognized.
- ETSI NFV and Intent Management / handler enhancements Deng Lingli CMCC
- Notes tba
- Key milestone is the completion of Stage 2 requirements in 2023H1
- Q&A
- Active discussion on the distinction between Intent Object and Intent Instances in context of Intent handler proposal.
- Discussion about scope of models Object in MANO and relationship to Network Services.
- Discussion of use of TOSCA For orchestration with NFVO.
- Main focus is to expose Intent API above Mano to simplify the interaction.
- Discussion about adding Intent to service request is not the same as managing the lifecycle of the service.
- Looking for a simplified Mano capability before considering incorporating the functionality of EM behind the Intent Manager to get a full NS Lifecycle vie. For further Study
- TMForum explained there single Intent API but with multiple ontologies and 'Connector' support for linking to other SDO model including those in Yang
- Noted that TM Forum rdfs approach creates a model at stage 2 which is automatically used to generate Stage 3 ontology specifications.
- Noted that there the move of TMF specification from IG1253 ( informative ) to TR 290/291/292/293 Normative specs is still not well-known nor that these spec are public.
- AP TM Forum to liaise information to ETSI about change of IG1253 to TR 290/291/292/293 Normative specs and provide URLs where they are available
- AOB/ next steps
- ETSI Release 4 proposal will have requirements /Stage 2 at end 2023H1 for Intent Handler
- Proposed a followup to see if TMF Intent API plus Ontologies could be a Stage 3 solution to the ETSI stage 2 Requirements for Intent Handler
- key discussion points,
- votes called for and results of same,
- decisions/agreements made during the meeting
- Actions (these can be captured using table)
- Other items relevant to the meeting/activity.
Action List
Next Meeting details
...