Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Workshop Dates and Time

Lead Organization

Agenda Topic




Resumed Meeting proposal

 

IEEEIEEE ( provisional)

 


Postponed 
Sync up on Intent progress 
ZSM/3GPP/TMF
Organisations not ready and 3rd Oct clashes eith P/H in China 

Will reschedule

 

LF ONAP

ONAP Intent Based Networks (90 mins)

  • A General Implementation with Intent-based network in ONAP – Keguang He
  • Application Service Descriptor (ASD) for K8s NFs – Marian Darula, et al

 

TM Forum

Resceduled  to 17th Jan 2023 

TM Forum Provisional Intent Management Interface Update: Catalyst results API and Ontology progress

  • Results of IDAN  catalyst DTW Copenhagen Sept 2022
  • TMF921 Intent API Update - Kevin McDonnell 
  • TIO  Intent Ontology Update -Joerg Niemoeller
  • Latest Intent Guides  (IDAN whitepaper,  IG1253E, TR293/294, etc) - Kevin and Joerg

 

LF ONAP

ONAP  (90 mins)

  • TOSCA Defined Control Loop Lifecycle Management Demo – Liam Fallon, Zu Qiang

Tuesday 

TM Forum

TM Forum Provisional Intent Management Interface Update: Catalyst results API and Ontology progress

  • Results of IDAN  catalyst DTW Copenhagen Sept 2022
  • TMF921 Intent API Update - Kevin McDonnell 
  • TIO  Intent Ontology Update -Joerg Niemoeller
  • Latest Intent Guides  (IDAN whitepaper,  IG1253E, TR293/294, etc) - Kevin and Joerg
20/ 27th March Monday ETSIETSI AN  White Paper presentatioin



Candidate Topics - Scheduling to be confirmed

...