A mapping of who to what topic to identify areas where SDOs want to make contributions. Note that a distinction is made between topics and deliverables in matrix; both need to be completed.
(Taken from MSDO Meeting #2)
Topic/Concept | 3GPP SA5 | CCSA | ETSI ENI | ETSI F5G | ETSI MEC | ETSI NFV | ETSI PDL | ETSI TC INT /AFI | ETSI ZSM | GSMA TOP | IEEE Future Networks | IETF WG AN | ITU-T FG-AN | LFN ONAP | NGMN | TM Forum |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Autonomous Network | FD | ✔ | I | I | I | FD | ||||||||||
AN Levels | FD | FD | ||||||||||||||
Intent-driven interactions | ||||||||||||||||
Control Loops | FD | |||||||||||||||
Autonomous Domain | ||||||||||||||||
Others ...x | ||||||||||||||||
y | ||||||||||||||||
z | ||||||||||||||||
Deliverable | ||||||||||||||||
Technical Work (Frameworks/Interfaces) | ||||||||||||||||
Conceptual Models (only) | ||||||||||||||||
Use cases /PoCs | ||||||||||||||||
Testing /Verification |
Values
- FD = Formally Defined
- D = Described
- S = Topic in Scope
- I = Interested in topic
- Empty or NI = Not Interested in topic