Included items carried over frmm cancelled meeting on 19th June 2021
Date
Apologies
Bridge Details
supplied todirectly to SDO leads as restricted to formal SDO representatives.
Input Material
- WP01 r1 and WP02 on page: Work Packages ( WP)
- Multi-SDO AN Meeting Schedules
Meeting Agenda Update in Green
- Introduction
- Permission to record
- Agenda review and location of input contributions.
- Review threads names in WP01 and decide if to change names. See WP01r1 Work Packages ( WP)
- Review /agree meeting schedule proposal Multi-SDO AN Meeting Schedules
- Briefing update on outputs of open discussion group, and what action needed to share workplan information
- Overall workplan WP01/WP03 Work Packages ( WP)
- Briefing Roadmap and landscape WP02. Work Packages ( WP)
- What action needed to share workplan information to support WP02 Roadmap and landscape. Work Packages ( WP)
- agree how to coordinate updates and maintain the tables on pages:
- agree how to coordinate updates and maintain the tables on pages:
- Review and Progressing Liaisons – How to progress, timescales, etc.
- AOB
Call for IPR Declaration – IPR Statements for Use in Meetings
Call for IPR Declaration
- Informational Meetings (Open Meetings)
“This is an open information meeting in which no information or materials furnished or provided by the attendee shall constitute or contain intellectual property and will not be treated or protected as such. All attendees understand and accept this statement.”
Meeting Type | Informational Meeting |
---|---|
IPR Claims |
Meeting notes
- tba