Date
Dave Milham | TM Forum |
Yuval Stein | TM Forum |
Ton Brand (ETSI) | ETSI |
klaus_martiny (Deutsche Telekom) | ETSI |
Tayeb Ben Merim (Orange) | ETSI |
Kevin McDonnell ( Huawei) | TM Forum |
Tayeb Ben Merim (Orange) | |
luigi licciardi ( HUawei) | TM Forum |
(Orange) Nick Sampson | ETSI |
(Orange) Nick Sampson | ETSI |
Zoulan z00340018 HUawei | 3GPP |
Aaron Boasman-Patel | [email protected] |
Dr.Muslim Elkotob (Vodaphone( | IEEE |
Wong# Leon | Leon | RMI | [email protected] |
Taka Nakamura INTT) | TM Forum |
Taka Nakamura | TM Forum |
Dong Sun | TM Forum |
Ranganai chaparadza | IEEE |
Haining Wang | |
Haining Wang - Intel |
Apologies
Bridge Details
Supplied directly to SDO leads as restricted to formal SDO representatives.
Input Material
- Draft: An MoU for an Autonomous Networks Multi-SDO Initiative - Please Review (MSDO-6)
- MSDO-5 Joint SDO AN White Paper-3. pptx.pptx
- WP01 r1 and WP02 on page: Work Packages ( WP)
- Multi-SDO AN Meeting Schedules
Meeting Agenda
Call for IPR Declaration – IPR Statements for Use in Meetings
Call for IPR Declaration
- Informational Meetings (Open Meetings)
“This is an open information meeting in which no information or materials furnished or provided by the attendee shall constitute or contain intellectual property and will not be treated or protected as such. All attendees understand and accept this statement.”
Meeting Type | Informational Meeting |
---|---|
IPR Claims |
Recording
Topic: AN-SDO Collaboration's Personal Meeting Room
tba
Chat log:
Meeting notes
- Introduction
- Meeting is a formal meeting between SDO representatives
- Permission to record
- Request to record made - granted recording attached above
- Agenda review and location of input contributions.
- Input contributions in the inputs section and on the shared work area at: Incoming Contributions.
Action List
- AP TMForum Dave Milham update MoU draft to be a Letter of Intent (LoI).
- AP TM Forum send a liaison within two days with LoI request comment and feedback on the Letter of Intent within 2 weeks.
- AP ALL SDO to provide initial comment on the proposal by the 5th July and indicate when they could formally agree to the Letter of Intent ( will depend on each SDO internal procedures.
- AP TM Forum will draft an MSDO IPR proposal for review and agreement by liaison.
- AP TM Forum will set up a working confluence page based on structure in WP05 and invite contributions
- AP TM Forum will make changes to the schedule on meeting page Multi-SDO AN Meeting Schedules
- AP IEEE will make a proposl for the contents of such Common Operatinal Principles document